posts- box 1 foamtrack6 – 8192020 August 19, 2020 1080 × 1440 HO layout Progress – The first 2 boxes for the west wall yard area more track being laid on the second box. Note that we have cork road bed onto top of cork sheeting for the main lines. All sidings and yard is a slightly lower level