These photos represent some of the progress that we have made in our new facility during 2020, a year that has been challenging to say the least!
Please Enjoy!
track laying with some of the tools of the trade. The hammer is particularly useful to control the peanut gallery
tunnel bores into the storage room
ply base for the return loops
cork laying. doesnt look pretty but as its unscenicked it doesnt matter
completed track laying
more track being laid on the second box. Note that we have cork road bed onto top of cork sheeting for the main lines. All sidings and yard is a slightly lower level
Phil and Don helping smooth the foam surface before laying cork roadbed
cork in sheets were layed first. This is the yard area. Track and turnouts positions were tracked from using a full size printed template of the layout
track started to be laid. track on this section was glued down. Turnouts had predrilled holes underneath for the switchblade control arm and access to the frog