Planning – Assigned/Awaiting Completion

Assigned To Project Title Location Priority ETA To Edit
10/17/17 Bill Dillon Convert all staging to tortoise/DCC HO Layout Medium 03/03/18
08/15/17 Floyd Shell Add foundations to all buildings HO Layout Medium 12/30/17
07/18/17 Bill Dillon Switching layout HO Layout High 10/28/17
05/06/17 Keith Waddell Detailing of roundhouse inside HO Layout Medium 10/31/17
03/21/17 Floyd Shell Finish work on Club Engine Rolling Stock Low 06/20/17
01/16/18 Brad Brown Distillery Grain Transfer Facility HO Layout Low
08/19/17 Bob Ellis Switching Layout - Scenery Switching Layout Medium 11/04/17
08/05/17 Keith Waddell Altering the existing roundhouse HO Layout Medium 10/28/17
08/05/17 Unassigned Finishing the area around the turntable HO Layout Medium 10/31/17
09/19/17 Dave Fode Dutch Flats #2 passing switch HO Layout High 09/30/17
09/19/17 Dave Fode Label HO switches with numbers HO Layout Medium 10/28/17
11/21/17 John Eilers Redecal (and repair) 2-8-2 For WSL HO Layout Medium 02/03/18
11/21/17 John Eilers model Steam engine repair tools work bench Medium 02/03/18
01/16/18 John Bowles Action button for road crew HO Layout Medium 05/01/18
02/20/18 John Eilers Install overhead Steam pipe to Garden tracks. HO Layout Medium 06/15/18

Model Railroad Club