Click a column header to sort
Status | Project Name | Location | Category | Priority | Assigned |
---|---|---|---|---|---|
Completed | Replace short line switches | HO Layout | Trackwork | Medium | 09/09/17 |
Cancelled | Lower edges, install better plexiglas | HO Layout | Structural | Medium | |
Cancelled | Convert Yard into passenger terminal. | HO Layout | Scenes | Low | |
Cancelled | Front of Layout Expansion | HO Layout | Trackwork | Low | |
Cancelled | Rework Penryn/Norden | HO Layout | Trackwork | Low | |
Cancelled | Rename all locations on layout | HO Layout | Trackwork | Medium | 05/06/17 |
Cancelled | Rebuild upper yard | HO Layout | Trackwork | Low | |
Cancelled | Visible indication for staging | HO Layout | Control | Low | |
Cancelled | Convert staging to tortoise/DCC | HO Layout | Control | Medium | 10/17/17 |
Completed | Add foundations to all buildings | HO Layout | Buildings | Medium | 10/16/18 |
Cancelled | Add LED/Spot lights to layouts | Facility | Lighting | Low | |
Completed | Switching layout | Modular | Trackwork | High | 07/18/17 |
Completed | South end cabinets | Facility | Storage | High | 02/21/17 |
Completed | Desert Mountain umbrella project | HO Layout | Scenery | High | 01/01/14 |
Completed | Shortline-Desert Mine | HO Layout | Scenes | High | 02/21/17 |
Completed | Shortline-Ghost/Company town | HO Layout | Scenes | High | 02/21/17 |
Completed | Shortline -Crude Oil | HO Layout | Scenes | High | 02/21/17 |
Completed | Shortline-Ranch and transition | HO Layout | Scenes | High | 02/21/17 |
Completed | Source action buttons for layout | HO Layout | Animation | Medium | 03/21/17 |
Cancelled | Shortline switchable to isolated dcc | HO Layout | Control | Low | 01/16/18 |
Cancelled | Bookshelves under HO Layout front | Facility | Storage | Low | |
Completed | Move tool boxs to end caps | Facility | Storage | High | 02/21/17 |
Completed | Short line DC control system | HO Layout | Control | Medium | 02/21/17 |
Completed | Detailing of roundhouse inside | HO Layout | Scenes | Medium | 05/06/17 |
Cancelled | Wigwag Illumination | Facility | Lighting | Low | |
Cancelled | Add LED indicators to sidings | HO Layout | Control | Medium | |
Completed | Finish work on Club Engines | Inventory | Locomotives | Low | |
Cancelled | Add signaling to the layout | HO Layout | Control | Low | |
Completed | Power issues with Staging tracks | HO Layout | Trackwork | High | 03/21/17 |
Completed | Roseville yard crossover has issues | HO Layout | Trackwork | High | 03/21/17 |
Cancelled | Paint gray file cabinets | Facility | Storage | ||
Cancelled | Move DCC cabinet to other side | Facility | Storage | Low | |
Completed | Install wall mount fans | Facility | HVAC | High | |
Cancelled | Distillery Grain Transfer Facility | HO Layout | Scenes | Low | 01/16/18 |
Completed | Install stops for ground throws | HO Layout | Trackwork | Medium | 08/15/17 |
Cancelled | Add additional circuit breaker protection | HO Layout | Control | High | 09/19/17 |
Completed | Reduce magnet height in yards | HO Layout | Trackwork | High | 08/15/17 |
Completed | Switching Layout – Trackwork | Modular | Trackwork | High | 08/15/17 |
Completed | Switching Layout – Electrical | Modular | Control | Medium | 08/15/17 |
Completed | Switching Layout – Construction | Modular | Structural | High | 07/18/17 |