My Projects

Click a column header to sort

Status Project Name Location Category Priority Assigned
Completed Replace short line switches HO Layout Trackwork Medium 09/09/17
Cancelled Lower edges, install better plexiglas HO Layout Structural Medium
Cancelled Convert Yard into passenger terminal. HO Layout Scenes Low
Cancelled Front of Layout Expansion HO Layout Trackwork Low
Cancelled Rework Penryn/Norden HO Layout Trackwork Low
Cancelled Rename all locations on layout HO Layout Trackwork Medium 05/06/17
Cancelled Rebuild upper yard HO Layout Trackwork Low
Cancelled Visible indication for staging HO Layout Control Low
Cancelled Convert staging to tortoise/DCC HO Layout Control Medium 10/17/17
Completed Add foundations to all buildings HO Layout Buildings Medium 10/16/18
Cancelled Add LED/Spot lights to layouts Facility Lighting Low
Completed Switching layout Modular Trackwork High 07/18/17
Completed South end cabinets Facility Storage High 02/21/17
Completed Desert Mountain umbrella project HO Layout Scenery High 01/01/14
Completed Shortline-Desert Mine HO Layout Scenes High 02/21/17
Completed Shortline-Ghost/Company town HO Layout Scenes High 02/21/17
Completed Shortline -Crude Oil HO Layout Scenes High 02/21/17
Completed Shortline-Ranch and transition HO Layout Scenes High 02/21/17
Completed Source action buttons for layout HO Layout Animation Medium 03/21/17
Cancelled Shortline switchable to isolated dcc HO Layout Control Low 01/16/18
Cancelled Bookshelves under HO Layout front Facility Storage Low
Completed Move tool boxs to end caps Facility Storage High 02/21/17
Completed Short line DC control system HO Layout Control Medium 02/21/17
Completed Detailing of roundhouse inside HO Layout Scenes Medium 05/06/17
Cancelled Wigwag Illumination Facility Lighting Low
Cancelled Add LED indicators to sidings HO Layout Control Medium
Completed Finish work on Club Engines Inventory Locomotives Low
Cancelled Add signaling to the layout HO Layout Control Low
Completed Power issues with Staging tracks HO Layout Trackwork High 03/21/17
Completed Roseville yard crossover has issues HO Layout Trackwork High 03/21/17
Cancelled Paint gray file cabinets Facility Storage
Cancelled Move DCC cabinet to other side Facility Storage Low
Completed Install wall mount fans Facility HVAC High
Cancelled Distillery Grain Transfer Facility HO Layout Scenes Low 01/16/18
Completed Install stops for ground throws HO Layout Trackwork Medium 08/15/17
Cancelled Add additional circuit breaker protection HO Layout Control High 09/19/17
Completed Reduce magnet height in yards HO Layout Trackwork High 08/15/17
Completed Switching Layout – Trackwork Modular Trackwork High 08/15/17
Completed Switching Layout – Electrical Modular Control Medium 08/15/17
Completed Switching Layout – Construction Modular Structural High 07/18/17

Model Railroads