Planning – Assigned/Awaiting Completion

Assigned To Project Title Location Priority ETA To Edit
07/18/17 Bill Dillon Switching layout Modular High 10/28/17
01/16/18 Bill Dillon Shortline switchable to isolated dcc HO Layout Low 04/17/18
01/16/18 Brad Brown Distillery Grain Transfer Facility HO Layout Low
08/19/17 Bob Ellis Switching Layout - Scenery Modular Medium 11/04/17
08/05/17 Keith Waddell Altering the existing roundhouse HO Layout Medium 10/28/17
08/05/17 Unassigned Finishing the area around the turntable HO Layout Medium 10/31/17
09/19/17 Dave Fode Dutch Flats #2 passing switch HO Layout High 09/30/17
09/19/17 Dave Fode Label HO switches with numbers HO Layout Medium 10/28/17
11/21/17 John Eilers Redecal/repair 2-8-2 For WSL Inventory Medium 02/03/18
11/21/17 John Eilers Acquire Steam engine repair tools Facility Medium 02/03/18
01/16/18 John Bowles Action button for road crew HO Layout Medium 05/01/18
07/17/18 Keith Waddell Club standards for rolling stock Inventory Medium 08/01/18
04/17/18 Keith Waddell Garden track surface around roundhouse HO Layout High 05/01/18
02/20/18 John Eilers Steam pipe to Garden tracks. HO Layout Medium 06/15/18
04/17/18 Chris Roberson Ready HO layout for disassembly HO Layout High 07/01/18
03/27/18 Jud Reeves Ready N layout for disassembly N Layout High 05/01/18
04/17/18 Keith Waddell Garden Track duckboards and ballasting HO Layout High 05/01/18

Model Railroad Club