posts- box 1 foamtrack4 – 8192020 August 19, 2020 1440 × 1080 HO layout Progress – The first 2 boxes for the west wall yard area track started to be laid. track on this section was glued down. Turnouts had predrilled holes underneath for the switchblade control arm and access to the frog