Add signaling to the layout
Status: Cancelled
Submitted: 03/17/17 ? By: Location: HO Layout Category: Control
Assigned: ? To: Unassigned Priority: Low ETA:
Skills Taught: Electrical
Detailed Description (What):
Signal the entire mains at minimum.
Choose logical blocks, install signals (Details west all in one)
Determine methodology for block detection (DCC? CTC? Other?)
Reason(s) (Why):
Signalling is a major part of railroad rights of way. Adding signals will make the layout look more real
Notes:
PLACED ON HOLD UNTIL LEASE ISSUES ARE RESOLVED.
The signals could be installed before the control scheme is determined since they are standardized.
Link to Details West Signals
http://www.detailswest.com/signals.htm
Keith/Lou/Bill to come back with specific proposal.
Attachments: Click image(s) to view