My Projects

Ready N layout for disassembly

Status: Completed

Submitted: 03/19/18  ? By:       Location: N Layout       Category: Structural

Assigned: 03/27/18   ? To: Jud Reeves       Priority: High       ETA: 05/01/18

Skills Taught:   Electrical, Woodworking

Detailed Description (What):

Identify what needs to be done to separate layout into sections that be removed from the building. Ideally, the cut points would be identified (but not done) and the wiring underneath can be cut and reattached with connectors.

Reason(s) (Why):

Planning for the worst case scenatio, if we have to vacate the premisis, we should be prepared so we can complete it within the timeframe provided.

Notes:

Attachments:      Click image(s) to view

Model Railroads