South end cabinets
Status: Completed
Submitted: 12/20/16 ? By: Robert Ramirez Location: Facility Category: Storage
Assigned: 02/21/17 ? To: Bob Ellis Priority: High ETA: 05/12/17
Skills Taught: Woodworking
Detailed Description (What):
Build new upper and lower cabinets on south end of facility.
Reason(s) (Why):
To retain as much storage as possible around new switching layout.
Notes:
HEIGHT: 3 5/8″ toe kick, 34 3/8″ cabinet, 4″ layout table thickness takes top of layout to 42″. 18″ gap to bottom of upper cabinet. Top cabinet height 30″, 2 inch gap to ceiling. DEPTH: Base cabinet 15″, top cabinet 12″.
Materials not to exceed $1200.00 Bill to get quote from cabinet shop by 2/28
Attachments: Click image(s) to view