HO layout progress Sep24th

Hi Fans,

just a quick note on progress on the HO layout. 

Firstly Box 6 has been completed and now has foam and cork on it. The track plan has been mapped out and the rest of the yard turnouts have been wired and are set for install. Thanks Phil and Wayne.

Secondly Bob E has been busy again. he has built two elevated track structures, one for the corner on box 4 and the other as a temporary elevated section while the L is built. Wayne painted it grey. Phil laid track on it as well.

Lou and Mark W came in to discuss servo control and show off their design of a control panel and turnout control using Nanos. Pretty cool stuff.