posts- box 1 foamtrack5 – 8192020 August 19, 2020 1440 × 1080 HO layout Progress – The first 2 boxes for the west wall yard area more cork laying on the second box and the turnouts were preset up with cuts to allow control of frog polarity and a separate wire for the frog.