Some diligent work by Don and Wayne has resulted in the install of the first bridge on the layout. Although we have an extensive elevated section, this is the first real bridge. The spline was cut and they installed the Bridge donated by Richard Batho into the space. Looks nice with the Abutments in place.
You must be logged in to post a comment.